Tile Roofing

Mortar Failure at Hips and Ridges — Quick Reference

· Roofing Expert

Mortar Failure at Hips and Ridges — Quick Reference

How to read an estimate for a tile roof in Pacoima, and what to compare line by line.

Choosing a roofer is mostly a matter of reading estimates properly, which nobody teaches. For a tile roof in Pacoima, this is what to compare and what to ignore.

What actually matters

The tile itself is usually salvageable, so the cost is mostly labour: lifting and stacking, replacing underlayment and battens, then relaying. Breakage rate during lift-off matters, and so does whether matching replacements for the broken ones are still available.

The detail that is usually left out

Read the exclusions before the total. The cheapest quote and the best quote are occasionally the same document, and the exclusions are how you tell. Bird stops, eave closures and the mortar at the ridge are what most quotes leave out. Leave them off and you have an open roof edge that invites nesting, debris and, in the fire zones, embers. Ask how it will be handled in writing, and the rest of the job tends to go the same way.

What is specific to Pacoima

Pacoima sits on the flat below La Tuna Canyon, where the ground is level, the summers are long and hot, and the Sunland wind runs straight through with nothing to slow it. Those wind events are the single most common reason we get storm calls out of this area. Older single-storey stock alongside newer infill, and the failure patterns on each have almost nothing in common.

What we look at before quoting

  • Underlayment age and condition, checked by lifting tile rather than guessing
  • Broken, slipped and previously face-nailed tiles across the field
  • Batten condition and fixing, particularly at the eave course
  • Sunland metal, which usually corrodes before the underlayment fails
  • Ridge and hip mortar or mechanical fixing, and any movement in it
  • Bird stops and eave closures, present and intact
  • Flashing at walls, chimneys and every penetration through the field

Common questions

What should I check before signing?

Licence status, that the written scope matches what was discussed, and that deck repair is priced per sheet rather than left open.

Is a deposit normal?

A reasonable one is. What is not normal is a large payment before materials are on site, and California limits what can be asked for up front.

The honest summary

Judge a tile roof by its underlayment, not its tile. A roof that looks flawless from the driveway can be two winters from a ceiling repair, and the only way to know is to lift a few tiles and look. In Pacoima the thing to watch is wind-side edge detail, ridge fixing, and how much the drainage is carrying.

Want this looked at properly?

Free inspection, drone photography where access is difficult, and a written estimate with deck repair priced per sheet. No obligation.

More on Tile Roofing

← All posts

(818) 275-0921Text Us